In 2009, IES-Holding power plants produced 63.3 billion kWh of electric energy and 118.6 million GCal of heat. Compared to 2008, the electric energy output reduced by 7.77%, while heat output showed a slight drop at the rate of 1.46%.
A major uprate program is planned for the Leningrad power plant that should result in an extra 200 MWe of nuclear generating capacity. Three reactors at the power plant could benefit from a change to use uranium fuel at a higher level of enrichment.
Mechel OAO (NYSE: MTL), one of the leading Russian mining and metals companies, announces operational results for 2009.
An extended meeting of the collegiate panel of the RoK Ministry of Energy and Mineral Resources was held in Astana on January of this year, where the results of the financial and economic activities of JSC NC "KazMunayGas" for 2009 were summed up.
On February 1, 2010, Rosneft (the Company) was the first among its global peer group to publish audited consolidated financial results under US GAAP for 2009.
On 1 February 2010 OAO Gazprom issued its unaudited consolidated interim condensed financial information prepared in accordance with International Accounting Standard 34 “Interim Financial Reporting” (IAS 34) for the nine months ended 30 September 2009.
Vagit Alekperov, OAO LUKOIL President, signed a development and production agreement at the Iraqi West Qurna-2 field in Baghdad.
TNK-BP sold 38,520 tons of petroleum products at a large wholesale auction conducted by the Saint-Petersburg International Mercantile Exchange (SPIMEX), according to a corporate press release.
Vercknechonskneftegas produced 1.181 mln tons of oil in 2009 according to a company press release. Thus, its oil production plan was overfulfilled by 30%, and the well drilling plan was overfulfilled by 10%.
South Stream Hungary Zrt. will organize the preparation of a feasibility study of the Hungarian segment of South Stream, as well as finance, build and manage the gas pipeline in Hungary.