Kaluga Turbine Works (KTZ), a branch of Power Machines, manufactured the first 50 MW steam turbine for Novolipetsk Steel (NLMK).
Аt the Gazprom headquarters Alexey Miller, Chairman of the Company’s Management Committee and Oleg Chirkunov, Governor of the Perm Krai signed an Agreement of Cooperation between Gazprom and the Perm Krai for an indefinite period.
In February of 2010 Balakovo NPP in accordance with operations schedule generated more than 2.132 bln. kWh of electric power. Installed capacity utilization factor (ICUF) made 79.34%. The best ICUF value is achieved at power units No. 2 and 3 – 106.9%.
The Gazprom headquarters hosted today a working meeting between Alexey Miller, Chairman of the Gazprom Management Committee and Sergey Katanandov, Head of the Republic of Karelia.
In February of 2010 power unit of Beloyar NPP BN-600 functioned at nominal level of output and generated 401.64 mln. kWh of electric power. The monthly plan for generation is fulfilled for 104.3%. Installed capacity utilization factor in February made 99.61%.
The average gas penetration level in the region is below 1 per cent. The same rate throughout Russia averages 63.2 per cent. Between 2007 and 2009 Gazprom allocated RUB 1.1 billion for the regional gasification.
"Belkamneft", a subsidiary of OAO NK "RussNeft" started 3D seismic works at Pionerskoye oilfield. The research is being conducted in conformity with license obligations for geological study of subsoil.
Cooperation Agreement 2010 was signed between Gazprom Neft and the Administration of Nadymskiy District of YaNAO.
This summer, a decision on making the application for technical connection to “Karelenergo” electric grids is to be adopted due to results of specified estimation of possibility to create “Karelia Energy Bridge”.
Much attention was given to increase of emergency situations prevention system efficiency on power industry sites. All planned events and arrangements are fully completed.