In Moscow JSC «Atomenergoproekt» design sister company — VVER Design Center there was held a routine meeting regarding use of the software complexes SmartPlant of «Intergraph» Co. for issuance of documentation on electrical part of NPP power unit in frame of VVER -ТОI project.
The OAO LUKOIL Board of Directors approved a Supplement Agreement to the Intragroup Loan Agreement between ОАО LUKOIL and LUKINTER FINANCE B.V., which provides for the loan increase of USD 7 billion up to USD 15 billion. The other essential conditions of the Loan Agreement shall remain unaltered.
Suvorovsky Prospect joined SCF Group’s fleet. The vessel is a technologically advanced and large-capacity Aframax tanker. The official naming ceremony took place at the Hyundai Heavy Industries shipyard (Republic of Korea).
The audit results by Miller and Lents, a US firm, suggest that the Company’s proved hydrocarbon reserves as of December 31, 2010 came to 17.3 billion barrels of oil equivalent, including 13.3 billion barrels of oil and 23.6 trillion cubic feet of gas.
The Polish state-owned utility PGE jointly with the grid operator PSE Operator are negotiating with the Russian Inter RAO UES on potential construction of an ETL from Kaliningrad to Poland.
OJSC "Turboatom" tested and dispatched to the customer equipment for unit No 6 TPP Aksu. On the test bench were collected cylinders of high, medium and low pressure turbine rotors for the K-325-23,5.
Mechel OAO completed two placements of its interest-bearing commercial papers of the 15 and 16 series with an obligatory centralized custody (ID serial number 4-15-55005-E of 10.08.2010 - 15 series, 4-16-55005-E of 10.08.2010 - 16 series) at MICEX Stock Exchange ZAO.
The Federal Antimonopoly Service (FAS Russia) found that the group of persons including “RUSAL Krasnoyarsk” OJSC, “RUSAL Sayanogorsk” OJSC, “RUSAL Bratsk” OJSC, “RUSAL Novokuznetsk” OJSC and “SUAL” OJSC violated Part 1 Article 10 of the Federal Law “On Protection of Competition”.
JSC «Atomenergoproekt» (Moscow) develops design documentation on construction of pilot power unit with the reactor plant SVBR-100 (Fast neutron reactor with lead-bismuth coolant). A relevant contract has been signed with FSUE «RF State Scientific Center — Leipunsky Physical Energy Institute (Obninsk, Kaluga region).
JSC КаzМunaiGas Exploration Production (“КМG EP”) announces results of the annual reserves audit, as at 31 December 2010. According to the report by the independent energy consulting firm Gaffney, Cline & Associates (“GCA”), proved plus probable (2P) reserves excluding the stakes in JV Kazgermunai LLP, CCEL and PetroKazakhstan Inc. were 232 million tonnes (1,707 million barrels).