New oil well put into operation in “Gum daniz” field

Options

New oil well put into operation in “Gum daniz” field

Daily production of the well drilled to the depth of 2952-2945 meters to Fasila Suite by “Gum Adasy” Drilling Works Office of the Complex Drilling Works Trust makes 20 tons of oil and 7000 cubic meters of gas.
At present, drilling of the well № 472A from the platform № 470 in the same field has been completed. According to the estimations of geologists the well with the design depth of 3400 meters will produce 20 tons of oil per day. Both of the wells will be put into operation by “Gum Adasy” OGPD.

RU

Full version

Close
Яндекс.Метрика