The Shell Eastern Petrochemicals Complex (SEPC) project in Singapore has created Shell’s largest, fully-integrated refinery and petrochemicals hub.
The Gazprom headquarters hosted a meeting dedicated to execution of the Shtokman gas and condensate field (GCF) development project. The meeting was moderated by Alexander Ananenkov, Deputy Chairman of the Company’s Management Committee.
TNK-BP subsidiary Varyeganneftegaz successfully completed testing nitrogen foam hydraulic fracturing at the Verkhnekolik-Egansk field. The first “foam” hydraulic fracturing was conducted at well 3120 pad #132 within the framework of a pilot program for innovative frac projects at Varyeganneftegaz.
Huge discoveries of natural gas promise to shake up the energy markets and geopolitics. And that's just for starters.
OAO “Ulyanovskneft”, a subsidiary of OAO NK “Russneft”, changed the manufacturing scheme of the reservoir pressure maintenance system and formation water utilization at Verkhozimskoye oilfield.
In the first quarter of 2010 IES-Holding's power plants generated 21.27 billion kWh of electric power and 51.3 million Gcal, which is 0.96% and 8.6% higher than in 2009 respectively.
The Gazprom headquarters hosted a meeting moderated by Alexander Ananenkov, Deputy Chairman of the Company’s Management Committee and dedicated to the Gas Supply to the Kamchatka Oblast, Phase 1 – Gas Supply to Petropavlovsk-Kamchatsky investment project.
Engineers will use golf balls and shredded automobile tires in what they call a "junk shot" to try to clog the oil well that has been leaking crude at the bottom of the Gulf of Mexico since the sinking last month of the drilling rig Deepwater Horizon.
OJSC Varieganneftegaz (a member of the TNK-BP structure) plans to drill up to 100 wells in 2010; 16 of them will be drilled above and beyond the required number.
The statements for 2010 for the first time after the reorganization make it possible to analyze the changes of the return figures of the company at the basis of fully comparable data.